Post-renovation commissioning, 900+ room Mediterranean resort
Bringing a fully renovated 900+ room resort back into operation.

Professional experience — not a TEX Group project. This work was delivered before TEX Group was formed and remains attributed to the professionals and organisations responsible for it. It is shown to demonstrate relevant operating experience, not as a TEX corporate reference.
Period
2018
Services
TEX Project
TEX Management
{THE BRIEF}
A 900+ room resort completed a full renovation and had to reopen to a fixed date. Construction handover and operational readiness were running against each other.
The property could not be handed to the operating team as a building; it had to be handed over as a working operation, with every outlet, system and department tested before guests arrived.
{WHAT WE DID}
Snagging list built from an operator’s perspective, not only a contractor’s
Room and public area testing against operating standards
Technical systems commissioned with the departments that would run them
Team recruited and trained ahead of the reopening date
Soft-opening period used to close remaining gaps




{THE RESULTS}
Rooms